Delta Ditch Run at Stockton Sailing Club/Richmond Yacht ClubJune 12
Story
Congratulations to Get Happy!!
Recap by Brendan Busch


Aerial Photos by H20 Shots
Result
PosBoatTotalRace 1
1Get Happy!!11
2Magic Bus22
3Shenanigans33
4Light'n Up44
5Discotheque55
6Dianne66
7Take Five77
8Opa!88
9Peaches99
10Desperado1010
11Libra11DNF
11El Raton11DNF
11Archimedes11DNF
11Expressway11DNF
11Scandalous11DNF
11Elise11DNS
export csv

Regatta Message Board

Reply | Post New Message | All Messages | this message is spam
Author: Bryan Myers ([email protected]) contact the author
Subject: [email protected]
Info: (19316 views) Posted: Sunday 11-11-12 09:33:02 AM
Hi all,

With a race looming next Saturday I just found out my forestay was in dire need of replacement and quickly dropped the mast to fix it.

Now my head is swimming with other things to do to the rig while it is down and switching the jib and main halyard sheaves from wire to rope is high on the list.

If I swap those out to rope, but keep my wire halyards for the time being what will happen? Would the wire ones immediately damage the rope sheaves? Will wire on rope sheave be functional at all?

I'm about to replace the mast step fiberglass and don't have the funds to do that AND switch to rope halyards at the moment. I just loathe taking the rig down so this is a perfect time to swap out those sheaves.

Thanks for any feedback.

Bryan

Reply | Post New Message | All Messages | this message is spam