Three Bridge Fiasco (Doublehanded) at Singlehanded Sailing Society | January 30 |
Story |
Fantastic day during the Three Bridge and Great turn out with 25 e27s participating.
SSS TBF Trophy Meeting Oakland Yacht Club, 7:30 pm Wednesday, February 10th. Congratulations to the winners! DH : El Raton (6th out of 284 overall) Recap by Ray SH : TAZ!! (1st out of 41 overall) Recap by George |
Result | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Regatta Message Board |
Reply | Post New Message | All Messages | this message is spam |
Author: Bryan Myers ([email protected]) contact the author Subject: Mast step fiberglass compression issues Info: (27381 views) Posted: Monday 11-16-09 04:04:55 PM |
My boat's A-Frame does extend down below the V-berth plywood (Hull 40).
What I see is some cracking along the edges of the A-frame right below the mast step, and 2 other cracks heading forward away from the frame to the 2 mast step bolts.
http://bryanmyers.com/maststep.zip
-Bryan
Reply | Post New Message | All Messages | this message is spam |
|