Spring Keel at St. Francis Yacht ClubMarch 3 - 4
Result
PosBoatTotalRace 1Race 2Race 3
1Witchy Woman6213
2Motorcycle Irene9126
3Baffett10631
4Wile E Coyote15744
5Magic Bus17458
6Xena18972
7El Raton193115
8Moxie20569
9Bessie Jay3112127
10Mirage3111911
11Peaches3214810
12Elise35131012
13Kolibri3781415
14Opa!39101514
14Wild Mojo41151313
15Radio Flyer4916DNF16
export csv

Regatta Message Board

Replying to this message
Reply | Post New Message | All Messages | this message is spam
Author: John Jacobs
Subject: Mooring of the express
Info: (12831 views) Posted: Tuesday 4-1-14 05:22:02 PM
Don,

I think I misread your "mooring" question and assumed you're at mooring instead of a dock.

Our boat came with wimpy little 4" bow cleats under the bow pulpit which we only use when throwing out a lunch hook. At a dock, bow lines are tied to the aft legs of the bow pulpit. Short pieces of 1/4" rod welded between leg and base prevents the line from sliding up the tube. An aluminum backing plate was added under the deck for the base screws.

I've thought about replacing the 4" bow cleats with larger ones but they're more likely to get in the way and snag running lines.

John

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -  

:: I had the same problem when I bought #92 in 2005.
::
:: My question to the group and the the responses are here

:: - 

:: http://express27.org/msgs/?f=1&m=1278#Message

:: and here -

:: http://express27.org/msgs/?t=561&m=1283#Message
::
:: Our solution:

:: A bridle is looped around the forward legs of the bow
:: pulpit. The bridle is prevented from sliding up the tube
:: by 1/4" rod welded between tube and base. An aluminum
:: plate was added under the deck for reinforcement of the
:: base screws.
::
:: Two 1/2" lines come from the mooring to the boat. One
:: line has a large caribiner snap hook on the boat end.
:: The other is plain line with no fitting on the boat end.
::
:: When we come to the mooring, the snap hook is snapped
:: over the bridle loop on the pulpit and we are safely
:: attached to the mooring. Later, the other line is
:: loosely tied with a bowline (rubber bands or ball
:: bungees retain the loose end) to the forestay fitting as
:: a backup. A 5/16" rod loop was added to the stem fitting
:: to accommodate the safety line (the jib tack loop might
:: also be used for this).
::
:: The first bridle was a continuous loop of high quality
:: 7/16" New England Ropes 3 strand nylon which lasted 7
:: too short Wisconsin summers. Last year it was replaced
:: with a single loop of 5/8" nylon braid which frayed from
:: the snap hook sliding over it in just a few months. This
:: year we are going back to 3 strand. There's almost no
:: chafing where the loop crosses the hull/deck edge.
::
:: We are in an exposed to the north anchorage where
:: northwest summer storms blow across a twenty mile fetch.

:: https://www.google.com/maps/@45.1584592,-87.1779456,3267m/data=!3...

:: No problems so far.
::
:: John

:: - - - - - - - - - - - - - - - - - - - - 
::
::
:: :: I keep the express in the water for 4 months a year. The
:: :: stern of the boat has cleats and easy to tie up. However
:: :: the bow has always been a challenge. How do people tie
:: :: ropes to the bow?
:: ::
:: :: I had made a loop of rope through the toe rail but over
:: :: time the toe rail wears through the rope.
:: ::
:: :: thanks!
Reply | Post New Message | All Messages | this message is spam

Your Name
Your E-Mail (optional)
Subject
Password (optional - allows you to delete later)