Reply | Post New Message | All Messages | this message is spam |
Author: Ralph Deeds ([email protected]) contact the author Subject: Re: Overrides Info: (28076 views) Posted: Friday 3-14-03 01:57:00 PM |
Cross-sheeting is easy with the #3. We leave three wraps on each winch and a winch handle in both winches at all times, and the crew goes immediately to the high side. Cross-sheeting is harder with the #1. You have to remove the winch handle and sheet from the off-side winch after breaking or the jib will hang up.
Also, the winches are 2-speed Lewmar 24s which aren't cheap but work great.
Reply | Post New Message | All Messages | this message is spam |
|